EPL Envoy
Task Light Field Installation Kit
Sheet 1 of 3
INSTALLATION INSTRUCTIONS
4/7/08
IMI-695D
IMPORTANT : READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN FOR FUTURE REFERENCE
GENERAL: Upon receipt of luminaire thoroughly inspect for any freight
WARNING: Make certain power is OFF before starting installation or
attempting any maintenance.
WARNING: Risk of Electric Shock. Disconnect power at fuse or circuit
breaker before installing or servicing.
WARNING: Risk of Burn. Disconnect power and allow luminaire to cool
before changing lamp or handling luminaire.
WARNING: RISK OF FIRE! DO NOT mount on or near combustible
materials.
damage, which should be brought to the attention of the delivery
carrier. Compare the catalog description listed on the packing slip
with the luminaire label on the housing to assure you have received the
correct merchandise.
SAFETY: This luminaire must be wired in accordance with the national
electrical code and applicable codes and ordinance. Proper grounding
is required to insure personal safety. Carefully observe grounding
procedure. All work should be done by a qualified electrician.
FAILURE TO FOLLOW INSTRUCTIONS MAY RESULT IN SERIOUS INJURY OR
DEATH
Figure 1
TAMPER-PROOF
SCREW FOR LATCH
TASK LIGHT FIELD KIT INSTALLATION: (Figure 1)
1. Note: Remove tamper proof screws first if luminaire includes (TR)
tamper-resistant option. (Figure 1).
TAMPER-PROOF
SCREW FOR HANDLE
2. To release clasp lock on “quick mount” bracket, push handle inward and
pull luminaire forward. (Figure 2). CAUTION: Do not let luminaire fall.
Support luminaire while lowering off of j-box to resting/hanging position.
3. Remove luminaire hanging hook from quick mount plate (Figure 3 & 4).
CAUTION: Support luminaire while removing.
LATCH
CAUTION: DO NOT place luminaire directly with lens facing down; it may
scratch or cause the lens to break. Place fixture with lens facing upright on
stable work surface. SUGGESTION: Remove the lens completely in order to
perform remaining of Task Light accessory installation.
Unlatch both latches. CAUTION: To avoid lens breakage, remove lens
retainer if necessary (Figure 5). Remove the complete lens assembly and
set aside to prevent damage. Take off upper reflector by loosening
thumbscrews (See figure 6).
Figure 2
TO REMOVE
HANDLE
4. Reference dimensions as shown and mark housing if necessary
(Figure 7 & 8).
5. Line up an adapter block and secure tightly if possible to aid in drilling
(Figure 7 & 8).
CAUTION: DO NOT drill or damage other components inside luminaire. To
avoid this from happening, remove them if necessary.
6. Drill center hole as specified and de-burr if necessary to remove sharp
edges (Figure 7 & 8).
Figure 3
QUICK MOUNT
PLATE
7. Drill and tap the two outside holes as specified (Figure 7 & 8).
8. Install gasket and adapter block (with provided fasteners) (Figure 9).
9. Apply sealing compound on the threads of handle (provided by others).
10. Pull wires out of head through access in block. Screw the handle into
adapter block. On inside of fixture, make connections and restrain with
wire tie.
HANGING
HOOK
11. Aim the handle to a preferred position and lock it in position.
12. Aim task light head to a preferred position and tighten #10-24 Allen head
screw (with provided Allen wrench).
LUMINAIRE
13. To install lamp, remove task light cover by twisting counter-clockwise and
pulling out (Figure 9). CAUTION: Verify that lamp source and wattage
correspond with the luminaire label.
14. Re-install task light cover by pushing in and rotating clockwise (Figure 9).
These instructions do not claim to cover all details or variations in the equipment, procedure, or process described, nor to provide directions for meeting every possible contingency during installation,
operation or maintenance. When additional information is desired to satisfy a problem not covered sufficiently for user’s purpose, please contact your nearest representative.
NOTE: Specifications and dimensions subject to change without notice.
Customer First Center 1121 Highway 74 South Peachtree City, GA 30269 770.486.4800 FAX 770.486.4801 ADH080775
EPL Envoy
Parking Luminaire
Sheet 3 of 3
INSTALLATION INSTRUCTIONS
4/7/08
IMI-695D
IMPORTANT : READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN FOR FUTURE REFERENCE
Figure 7
Figure 9
ADAPTER
BLOCK
HANDLE
(APPLY SEALING
COMPOUND BY OTHERS)
.25-.375”
HOLE
ADAPTER
BLOCK
GASKET
TASK LIGHT
HEAD
DRILL/TAP
#10-24
DRILL/TAP
#10-24
.25
10-24
10-24
SCREW
ALLEN HEAD
TASK LIGHT
COVER
LATCH
LOCATION
LOCKNUT
LINE UP ADPATER
BLOCK HERE
1.75
Figure 8
.25-.375”
HOLE
ADAPTER
BLOCK
DRILL/TAP
#10-24
DRILL/TAP
#10-24
.25
(0,0)
LINE UP ADPATER
BLOCK HERE
LATCH
LOCATION
1.75
INDICATE UP
POSITION
These instructions do not claim to cover all details or variations in the equipment, procedure, or process described, nor to provide directions for meeting every possible contingency during installation,
operation or maintenance. When additional information is desired to satisfy a problem not covered sufficiently for user’s purpose, please contact your nearest representative.
NOTE: Specifications and dimensions subject to change without notice.
Customer First Center 1121 Highway 74 South Peachtree City, GA 30269 770.486.4800 FAX 770.486.4801 ADH080775
|