American Standard Hot Tub 6030Y2A202XXX User Manual

INSTALLATION INSTRUCTIONS  
Acrylux Builder Series (Above Floor Rough)  
Model 6030Y2A.102.XXX  
Model 6030Y2A.202.XXX  
Thank you for selecting American Standard – the benchmark of fine quality for over 100 years. To ensure this product is installed properly, please  
read these instructions carefully before you begin. Local building codes vary by location. Observe all local plumbing and building codes.  
RECOMMENDED TOOLS AND MATERIALS  
Tape Measure  
Mortar Compound (optional)  
Pencil  
Drill  
Saber Saw  
Level  
Safety Glasses  
Screws, 1" Flathead, Stainless  
STUD LAYOUT:  
The American Standard Acrylux Bathtub  
will fit all standard 30" x 60" tub walls.  
6030Y2A.102.XXX  
6030Y2A.202.XXX  
1"  
14"  
10"  
25mm  
19"  
483mm  
356mm  
254mm  
6"  
152mm  
31-1/2"  
800mm  
18"  
457mm  
Drain C  
L
Floor Cut Out  
6" x 10"  
8"  
203mm  
(152 x 254mm)  
59-7/8"  
1521mm  
60"  
1524mm  
30"  
762mm  
= stud location  
LHO shown - Reverse for RHO  
IMPORTANT:  
• Allow tub to reach room temperature before installation.  
• Read installation instructions carefully before starting project.  
• Keep instructions for warranty information.  
INSTALLATION INSTRUCTIONS  
STEP 1. PREPARING ALCOVE  
• Strip to bare studs.  
• Alcove studs should be constructed as shown above.  
• Floor must be clean, smooth, and level (check with level). Sub floor must  
be installed as in the stud layout. Do not install tub on open floor joists.  
• If required, cut hole in sub floor as shown above to accommodate drain.  
STEP 2. INSTALLING TUB  
• Trial fit tub in prepared alcove. With tub sitting flat on floor, check with  
level on top of tub. Tub should be level from front-to-back and  
side-to-side (Fig 1).  
FIGURE 1. Check to assure tub is level.  
• A floor leveling compound (smooth mortar) or a similar quick-setting  
compound specifically made for leveling floors may be used to fully  
support and level base.  
• After tub is leveled, if alcove is larger than tub, shim between tub and  
studs to create a tight fit. Screw tub flange to studs (Fig. 2).  
CLEANING  
• Do not use any abrasive cleaners or metal scrapers.  
• If drywall mud or plaster gets on your shower, it may be carefully removed  
with a wooden scraper made from a piece of scrap wood.  
• Adhesive may be removed with mineral spirits.  
®
®
• Ideal cleaners are Soft Scrub Gel or Comet Gel .  
WARNING:  
FIGURE 2. If necessary, shim between tub and studs  
for tight fit and screw to each stud.  
Some cleaning products are not suitable for use. Read all labels carefully.  
DO NOT USE if they say “not suitable for use with ABS, acrylic, or polystyrene.  
P r o d u c t n a m e s l i s t e d h e r e i n a r e t r a d e m a r k s o f A S A m e r i c a , I n c .  
©
A S A m e r i c a , I n c . 2 0 0 8  
754283-100 Rev. A  
 

ADC Network Router MMW 110 User Manual
AEG Cooktop 88131 K MN User Manual
AG Neovo Mouse LK1600 User Manual
Aiphone Wireless Office Headset B User Manual
Algolith Satellite Radio C3012 8001 200 User Manual
Alienware Personal Computer Aurora User Manual
American Dryer Corp Clothes Dryer ADG MLG 170DR User Manual
American Standard Multi tool 2004 User Manual
Audiovox Stereo Amplifier JPA260 User Manual
Avenview TV Converter Box C HDMI COMPVGA User Manual